Ongoing Projects

Treatment System: IDEA
Capacity: 80,000 PE (Ultimate: 134,000 PE)
Location: Bandar Bukit Mahkota, Selangor
Client: Knowledge Vision Sdn Bhd

Lifting System: Network Pumping Stations (NPS)
Capacity: NPS No.5 (13,000 PE), NPS No.6 (3,500 PE), NPS No.10 (9,000 PE), SPS No.7 (2,600 PE), SPS No.8 (2,300 PE), SPS No.9 (4,000 PE), NPS No.1 (1,000 PE), NPS No.3 (55,000 PE), NPS No.4 (75,000 PE), SPS No.2 (1,000 PE)
Location: Lembangan Sungai Langat
Client: Salcon Engineering Bhd / MMC Pembetungan Langat Sdn Bhd

Lifting System: Upgrading 2 Nos. Pumping Station (PS) & Sewage Treatment Plant(STP)
Capacity: PS 4 (12,750 – 27,500 PE), Upgrading PS 7C (3,500 PE), Upgrading STP (21,750 PE – 43,500 PE)
Location: Upgrading PS & STP at Bandar Mahkota Banting, Mukim Tanjung Dua Belas, Kuala Langat, Selangor
Client: Sanjung Merpati Sdn Bhd

Lifting System: Sewage Treatment Plant
Capacity: 1st Module = 37,500 PE Ultimate 225,000 PE 
Location: Tanjong Dua Belas, Kuala Langat, Selangor
Client: Seriemas Development Sdn Bhd

 

Project: Langat Centralised Sewage Treatment Plant                                                                                   Treatment System: Deep Aeration Method and Step Feed Multi-Stage Denitrification Process                                                                  Capacity: Ultimate 920,000 PE 
Location: Kampung Sungai Balak, Kajang, Selangor
Client: Salcon Loh & Loh JV Sdn Bhd / MMC Pembetungan Langat Sdn Bhd